Pat had the lock ready before I left the mooring. The first 3 locks We had to ourselves self service. Flows are down now the river has widened out, but We made good progress. A nearby moored boat meant that We had to do the Pumpout at Abingdon wrong sided a.d the pipe was bearly long enough. No moorings available at Wallingford for shopping as We had hoped. Next opportunity was Pangbourne where fortunately We did find space.
Comments